Blog
Back
Latest Notices
  • Argentina
    C |
    F
  • Paraguay
    C |
    F
  • Uruguay
    C |
    F

Uruguay – Operating activities at La Esperanza farm – August 2016

Given the frequency and amplitude of the Rio Negro floods next to our property, a feasibility study for the creation of a protection wall to be build in phase, was launched. Authorization process is in progress. Once the various phases will be completed, around 2,000 hectares will be protected and sustainable for crops or cattle activities.

Low lands to be protected for rice cultivation by the wall ; irrigation will came through a small existing reservoir, currently full of water as you can see.

 

LE 1 LE LE3